Runner Road closed up to two days for repairs


Audio|Source: Heartland Fire
01:55
Transcript:
San Diego, UMF4PIA, I think. San Diego, UMF3rd, then we're out to 2621 Runner Road. (name withheld) advising that in order for them to make the repairs, this is going to be an all-day project, maybe two days. They're going to bring in traffic control and all the necessary resources. We're going to remain on scene for maybe 30 more minutes until they set up the traffic control. Additionally, the sprinkler sum for the Sharp building is going to be out of service. They're making these repairs. And then Quadra is going to notify the other consumers of which areas are going to be out of water for the day. This is Hunter Dam will be on scene for one or two days. That's it. Engine 4 will be on scene for the next 30 minutes until traffic control is set up. And the sprinkler for the Stark facility will be out. on the right or do we need to put it in tests on our side? I have not made contact with them yet. I will. We're training up with a plan with the supervisor from Quadra Day. (name withheld) advising that in order for them to make the repairs, this is going to be an all-day project, maybe two days. They're going to bring in traffic control and all the necessary resources. We're going to remain on scene for maybe 30 more minutes until they set up the traffic control. Additionally, the sprinkler sum for the Sharp building is going to be out of service. They're making these repairs. And then Flodre is going to notify the other consumers of which areas are going to be out of water for the day. Hunter Dam will be on scene for one or two days and sit. Engine 4 will be on scene for the next 30 minutes until traffic control is set up. And the sprinkler for the start facility will be out.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Near Runner Rd, Campo, CA 91906
Correct
Incorrect