Railroad crossing protection confirmed operational


The report confirms that the railroad crossing protection at a specific location is functioning properly after maintenance work was completed.
Audio|Source: NS Sunbury Line
01:44
Transcript:
B1-4C2-1-0-0-2. That is for your line, over. Dispatch, RW. Mutual here. Dispatch at this time, I'd like to go ahead and cancel my bulletin number 1752-17552. For (name withheld) Avenue, H.A.682, DOT number 249-682 Delta. Jumpers have been removed, crossing's been tested, working as intended over. All right, give me a one second to try to find this in the sea of bulletins and blocks here. Correct, (name withheld) Avenue, H.A.682, both in 1752, 1752 over. All right, I understand. Jumpers have been removed and crossing protection at (name withheld) Ave. A mileposts, H.J. 682.42, still working as intended at 3.50 p.m. Jumper's been removed for (name withheld) Avenue, H.H682.2Bolt and 1752-17552. Canceled, crossing tested, working as intended at 350-350-350-0 on the PM. Over. Hi, that's for us. I thank you, everyone. Thank you, sir, Mursu.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Columbia County, PA
Correct
Incorrect