Painting work with traffic control on Woodcroft Parkway, Durham NC


The audio reports painting work at Home Place 2 on Woodcroft Parkway. It says traffic control is in place and engine units and personnel will be assigned to operations.
Audio|Source: Durham City Fire
00:28
Transcript:
Uncudges for painting, home place 2, 300, Woodcroft, (name withheld), Cross of Nutry Way and St. Child's Drive. Engine 6. (name withheld) will be on Ops 4 and Woodcroft are going to be on Ops General 5.
Uncudges for painting, home place 2, 300, Woodcroft, (name withheld), Cross of Nutry Way and St. Child's Drive. Engine 6. (name withheld) will be on Ops 4 and Woodcroft are going to be on Ops General 5.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Near W Woodcroft Pkwy, Durham, NC 27713
Correct
Incorrect