Rail personnel working at multiple track locations


Audio|Source: Bay Area Rapid Transit (BART) - Rail Operations
01:36
Transcript:
Good afternoon. Cover Dairy City. Temple. So 3.9 and then you tell you one. 7-7 release, 1254. 7-7 release, 1254. Thank you for M to 19 please. Every? This is a message from Bart Operations. There are personnel waste at 5 locations, C-7D5 interlocking, W-425 interlocking, behind physical barrier at a 57-interlocking, Hayward test track, and between C-35 interlocking and Walnut Creek Station. Health A. (name withheld), where Khairstrake for the Paid (name withheld), (name withheld), Trestrake, until 1,500 hours, rebeck. All right, (name withheld), (name withheld), Rely, Rely, Rett, 8,000 air clearance until 9,000 hours, (name withheld), rebate. Restrict, physical area established, not into our protected area. Any restriction, coordinate, switch to one, crank cloud with the SEC, rebate. So it's just you want to think it's not with the LCC. I re-banking correct power on 1256. This is the afternoon, Tanga 1-18, checking in the airport.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Hayward, CA
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect