Track integrity failure reported on Union Pacific Railroad


Audio|Source: Union Pacific Railroad - Jefferson City Area
01:37
Transcript:
Thatcher. This, Patrick. All right, over. Yeah, I should have some time there, try to make this a little quicker, getting this thing, this train loaded. If you get that time there on the main two, I can release, spend a five-minute notice when you'd run something. I mean, here comes your time there. The next train has to clear for is under you at 445, so maybe like a... 5 o'clock there over 3 track 1 integrity failure out u.p detector milepost 1 20.3 track 1 integrity failure out detector milepost 1.20.3. Track 1. Integrity failure out. U.P. detector milepost 1.20.3. Track 1. Integrity failure out. detector mileposts one two zero point three track one integrity failure out
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Near E State St, Jefferson City, MO 65101
Correct
Incorrect