Dredging operations on Upper Mississippi and Illinois rivers, St Charles County MO


Mechanical and hydraulic dredging operations are ongoing at multiple locations on the Upper Mississippi and Illinois Rivers. Mariners are instructed to contact vessels 30 to 45 minutes before passing and to proceed at slow speeds to ensure safety. Some navigation lights on bridges have been reported extinguished, and caution is advised in transit areas.
Audio|Source: Mississippi River Marine St Louis Area
03:18
Transcript:
00:00
Judging operations taking place in the Upper Mississippi River, Mallamarker, 821.2, starting August 19th, from 0,700 through Monday through Friday through Friday.
00:08
There will be five barters total on scene starting August 19th.
00:11
Correction, located at mile marker 815.5 along the river guide wall outside of the channel.
00:16
ITV, Margaret D. May may be reached on channels 1-2, 30 minutes prior to transiting, rig.
00:20
Be advised, Coscarb Sheet report of the parcelage, Red Dewey, near Malmarker, 7.05, on a lot from Mississippi River.
00:26
Break. There will be mechanical dredging operations taking place on the Upper Mississippi River in Mallarker 702, Monday through Friday, from 0,600, or 1800, starting on August 25th, ending December 3rd.
00:39
Manners are requested to contact the motor vessel Clevo Lee or motor vessel Scarlett River or motor vessel Warriors on sound of 1 314-1-6-8, 45 minutes prior to transient.
00:50
It will be a mechanical dredging office taking place in the upper Mississippi River at Mall 687.5, 688.
00:56
Monday and Friday, from 0,600 to 1, starting September 8th, ending October 3rd.
01:02
Banners are requested to contact.
01:03
Motor vessel wells or dredge weighed on channels 1 3 and 81-al, 30 minutes prior to transiting the area.
01:09
Butterfessel Wells will be pushing single material barge to and from the Brownville placement site up from Mississippi River Mall, 688.
01:16
There will be judging operations taking place in the upper Mississippi River at Mallmarker 2.56, 24 hours a day, 7 days a week.
01:23
Manors are requested to contact the Dredge Potter on channels 1 3,16, 30 minutes prior to transing the area.
01:28
Break. Commodore Meyer Light, lightless number at 16215 at Mallor, 204.3 on the right of sending bank has been imported as extinguished.
01:36
Break. Clark Highway Bridge, lightness number 16240.
01:40
Coast Guard received the report that all navigation lights are extinguished.
01:42
All mariners are advised the transit area of a caution, break.
01:45
Minnesota River Mile Marker 1-7-4, CSAH Bridge, 18 Bridge, lightless number 9400.
01:52
Coast Guard received the report that the upstream red light on the right of sending bank is extinguished.
01:56
Break.
01:57
Minnesota River mile marker 7.3.
01:59
Cedar Avenue dual bridge lines number 9445.
02:02
Guiscard received report that the downstream green light is extinguished break.
02:05
The following broadcast notice the manor is for the Illinois Ribbon break.
02:08
Illinois River Model Marker.
02:10
Corrections. There will be hydraulic dredging on the Illinois Waterway, Correya Pool, Clark Island, River Mall, 215-2 through 216, decimal 2.
02:18
Right and left descending bank.
02:19
We'll begin September 5th and continue 24-7 until further notice.
02:22
Judging the staking place in the left and right descending bank line with the crossing line blocking the navigation channel.
02:27
All mariners are requested to pass at their safest slow speed, to minimize wake, and hazards to the crew.
02:33
Contact the Dredge Barry J or motor vessel Mattisone in Challenge 13,16, or 7.3, for these 30 minutes prior to passing.
02:40
Instructions and allow the crew time to safely open the pipeline to pass traffic.
02:45
Break.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
Illinois
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect