Dredging operations on Upper Mississippi River with barge activity, St Charles County MO


Dredging operations are ongoing on the Upper Mississippi River near mile marker 812 with several barges present. Mariners should contact the vessel Margaret D on channel 12 before passing and proceed slowly and safely to minimize wake.
Audio|Source: Mississippi River Marine St Louis Area
00:24
Transcript:
00:00
There will be dredging operations taking place on the Upper Miss, Malmacher 8212, starting August 19th.
00:06
From 0,700 to 1900 Monday through Friday, there will be 05 barges total on-scene located Malmur 815.5 along the river guide wall outside the channel.
00:15
ITV Margaret D may be reached on channel 12, 30 minutes prior to transiting.
00:18
Maynager Earth, transit at their slow, safe speed to minimize wake and proceed with caution.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
St. Charles County, MO
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect