Maintenance work causes temporary road closure at crossing


Audio|Source: NS Pittsburg Line Allegheny Dispatcher
00:54
Transcript:
that you got the 28 with the lead engine 4-0774 calling east on main 2 it's going to be track speed once they're clear now that is correct let me know once we get through lawyer 2 cns matter go it then hey uh do you happen to have any guys you could cut loose come down here to the Huntington Crossing 4th Street and put jumpers on, have an excavator down here doing some work. He's going to be getting into the starts and pumping the gates over. Yeah, we're still on the crossing here on the body and come out. I'm not sure, (name withheld). Okay, let me know, please. All right, yeah, Roger. We'll send it in to you up to you, Anniston.
Disclaimer:
This was transcribed by AI and may contain errors. Please verify the information independently.
Location mentioned:
State Line, PA
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect