Temporary traffic closures for bridge maintenance, Hoquiam WA
Traffic will be temporarily closed on Simpson Avenue Bridge and Riverside Bridge for maintenance work, each lasting 5 to 10 minutes.
Audio|Source: Grays Harbor Sheriff East
00:7
Transcript:
Central units of Simpson Avenue Bridge and highway will be opening at 1,400 for 5 to 10 minutes for maintenance, followed by Riverside Bridge at 1410 for the same time.
Central units of Simpson Avenue Bridge and highway will be opening at 1,400 for 5 to 10 minutes for maintenance, followed by Riverside Bridge at 1410 for the same time.
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
