00:00
Available Island Drive, 911 hang up.
00:10
Got a 911 hang up at (number withheld) Island Drive, (number withheld) Island Drive at Novant Health Data Center.
00:21
Copy, I'll be in route.
00:23
Copy, sir, 15 fifty-five.
00:30
It's plotting into this location towards the Grogan Lake Road side of the building near the construction site.
00:40
Copy, advise it's still an open line.
00:52
10-2, be where else? 10-2, copy.
00:59
You was not able to get a hold of him, correct?