Safety zone set for Glen Island Bridge construction, New Rochelle NY
Heads up:
This is auto-generated from real-time dispatch calls. Information may be inaccurate. Listen to the original audio and verify critical information using official agency releases.
According to the dispatch call, the Coast Guard announced that a safety zone will be in effect around the Glen Island Bridge in New Rochelle due to construction from May 23 to October 1, 2025. Boat traffic will be restricted during heavy-lift operations, and mariners are advised to use caution near the bridge.
Audio|Heard on: Northern NJ and NY City Area Marine
Listen to dispatch call
00:30
Transcript:
00:00
Construction work on the Glen Island approach bridges will take place from May 23, 2025, through October 1, 2025, from 7 a.m.,
00:11
local time to 5 p.m., local,
00:14
from Monday to Friday.
00:17
During this time, a safety zone will be enforced when heavy-lift operations are in progress. Vessels may not enter or remain within the safety zone during the enforcement period unless authorized by the Coast Guard Captain of the Port.
00:27
All mariners are urged to exercise caution while in the area.
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
Location mentioned:
Glen Island Bridge, Glen Island Approach, New Rochelle, NY 10805
This shows a Google Street View of the area near the location, which might not be the exact address.
Correct
Incorrect
Note:
Auto-generated from live dispatch audio, which may contain errors. Dispatch calls are not confirmed incidents. Always verify with official sources.