00:00
763, we're under control.
00:03
The chief electrical engineer for the tunnel arrived on scene.
00:08
He went through the area with ladder 21, confirmed that fire has been extinguished and transformer is de-energized and cooled down enough.
00:17
We're going to turn the scene over to them at this time.
00:21
I'm trying to get some ventilation in the building to vent out the smoke and dry chem powder.
00:27
Units will go 10-8 on their MDTs.
00:28
Battalion 9 will go 10-8.
00:30
And just note that we were in communication with the Lincoln Tunnel Control Center throughout.
00:36
They operated with us on this whole incident, K.
00:47
All right, 10-4, Battalion 9.