Train crossing arms stuck down at 12th Street
Heard on: Lexington SC Law Dispatch Group Calls
00:23
00:00
Just advising that the train track arms are down again at 12th and Frank.
Traffic reported near Frank St, Red Bank, SC 29073 on Feb 14, 2026, 3:45 PM. As discussed during the dispatch call, dispatchers reported a possible electrical malfunction causing train crossing arms to remain down near 12th Street and Frank Street in Red Bank. AI-generated summary from public dispatch audio. Not an official report.
Full audio, timeline, and verification tools are unlocked inside CrimeRadar.