Construction causes tight intersection at Rigoletto
Heard on: Santa Clara CA Transportation Group Calls
01:17
00:00
Three two six transit, 326 .
Traffic reported near Brahms Ave & Rigoletto Dr, San Jose, CA 95122 on Mar 5, 2026, 11:03 AM. As discussed during the dispatch call, transit operators reported a possible traffic slowdown at the Rigoletto Drive and Brahms Avenue intersection in San Jose, likely caused by nearby construction. AI-generated summary from public dispatch audio. Not an official report.
Full audio, timeline, and verification tools are unlocked inside CrimeRadar.